Post by paraxion on Jan 16, 2019 0:40:11 GMT
Hi there, It'd be awesome for testing to be able to force a reload of the XML and go back to the first action, without restarting the entire task sequence. Is this something that's supported but I've missed the command for? Thanks, Matt
|
|
|
Post by Jason on Jan 16, 2019 2:05:44 GMT
Howdy. No, there's built-in for this; however, for testing, I do one of two things, usually in this order order as well:
1. Run UI++ manually from within a Windows command-prompt. Actual UI++ behavior will be the same. 2. If WinPE testing is needed, create a custom TS that simply has a pause action in it and/or an action to map to a drive where the UI++ files are at. Boot a test system using PXE or media and start the TS. When it pauses, open a command-prompt and run UI++.
For both 1 and 2, validate everything works UI wise and log wise. Tweak the XML as necessary if not and restart from the command-prompt. Rinse. Repeat.
|
|
|
Post by paraxion on Jan 16, 2019 2:07:10 GMT
Cool, both of those sound workable. Thanks for an awesome product btw
|
|